Optimism - Notice history

All systems operational

100% - uptime

Public API - Operational

100% - uptime
Jul 2023 · 100.0%Aug · 100.0%Sep · 100.0%
Jul 2023
Aug 2023
Sep 2023

Bridge UI - Operational

100% - uptime
Jul 2023 · 100.0%Aug · 100.0%Sep · 100.0%
Jul 2023
Aug 2023
Sep 2023

Deposits - Operational

100% - uptime
Jul 2023 · 100.0%Aug · 100.0%Sep · 100.0%
Jul 2023
Aug 2023
Sep 2023

Withdrawals - Operational

100% - uptime
Jul 2023 · 100.0%Aug · 100.0%Sep · 100.0%
Jul 2023
Aug 2023
Sep 2023

Transaction Sequencing - Operational

100% - uptime
Jul 2023 · 100.0%Aug · 100.0%Sep · 100.0%
Jul 2023
Aug 2023
Sep 2023

Batch Submission - Operational

100% - uptime
Jul 2023 · 100.0%Aug · 100.0%Sep · 100.0%
Jul 2023
Aug 2023
Sep 2023

Node Sync - Operational

100% - uptime
Jul 2023 · 100.0%Aug · 100.0%Sep · 100.0%
Jul 2023
Aug 2023
Sep 2023
100% - uptime

Public API - Operational

100% - uptime
Jul 2023 · 100.0%Aug · 100.0%Sep · 100.0%
Jul 2023
Aug 2023
Sep 2023

Bridge UI - Operational

100% - uptime
Jul 2023 · 100.0%Aug · 100.0%Sep · 100.0%
Jul 2023
Aug 2023
Sep 2023

Deposits - Operational

100% - uptime
Jul 2023 · 100.0%Aug · 100.0%Sep · 100.0%
Jul 2023
Aug 2023
Sep 2023

Withdrawals - Operational

100% - uptime
Jul 2023 · 100.0%Aug · 100.0%Sep · 100.0%
Jul 2023
Aug 2023
Sep 2023

Transaction Sequencing - Operational

100% - uptime
Jul 2023 · 100.0%Aug · 100.0%Sep · 100.0%
Jul 2023
Aug 2023
Sep 2023

Batch Submission - Operational

100% - uptime
Jul 2023 · 100.0%Aug · 100.0%Sep · 100.0%
Jul 2023
Aug 2023
Sep 2023

Node Sync - Operational

100% - uptime
Jul 2023 · 100.0%Aug · 100.0%Sep · 100.0%
Jul 2023
Aug 2023
Sep 2023

Notice history

Sep 2023

No notices reported this month

Aug 2023

OP Mainnet Sequencer Update Enabling ZDD
  • Completed
    August 28, 2023 at 5:10 PM
    Completed
    August 28, 2023 at 5:10 PM

    Maintenance has completed successfully.

  • In progress
    August 28, 2023 at 5:00 PM
    In progress
    August 28, 2023 at 5:00 PM

    Maintenance is now in progress

  • Planned
    August 28, 2023 at 5:00 PM
    Planned
    August 28, 2023 at 5:00 PM

    On Monday, August 28th at 17:00 UTC, we are upgrading the OP Mainnet sequencer deployment configuration to enable future zero downtime deployments. As part of this planned maintenance, users can expect up to five minutes of downtime on OP Mainnet.

    We’ll update this status once the maintenance window is completed and OP Mainnet is fully operational on https://status.optimism.io/

Jul 2023

Goerli Full Sync Issues
  • Resolved
    Resolved

    OP Goerli is no longer experiencing node halts, which were caused by the L1 Goerli testnet reorg. As shared in the previous status, full node operators do need to take one of the following actions:

    1. Delete Geth’s datadir, then replace it with the fully-synced archival database available from https://datadirs.optimism.io/goerli-bedrock-archival-2023-07-29.tar.zst.
    2. Make a call to eth_getblockbynumber with finalized as the block tag. Then, roll the full node back to that block value + 1 using debug_setHead.
    3. Resync the full node from a backup prior to block 12572500, or from genesis.

    This issue is resolved and we will be sharing a full post-mortem when ready.

  • Monitoring
    Monitoring

    We have identified the root cause of this issue.

    The L1 Goerli testnet experienced a large reorg of approximately 18 blocks. In addition to the large reorg, a significant number of blocks were missed, resulting in one large reorg and many missing blocks. This caused a large (>256 block) reorg on OP Goerli. Currently, users operating full nodes on OP Goerli will experience a node halt. These nodes will not sync new blocks from the OP Goerli network, and may return inconsistent data over RPC. Users operating archival nodes on OP Goerli are not affected and we do not expect this issue to occur in any capacity on OP Mainnet.

    To resolve this issue, full node operators need to perform one of these actions:

    1. Delete Geth’s datadir, then replace it with the fully-synced archival database available from https://datadirs.optimism.io/goerli-bedrock-archival-2023-07-29.tar.zst.
    2. Make a call to eth_getblockbynumber with finalized as the block tag. Then, roll the full node back to that block value + 1 using debug_setHead.
    3. Resync the full node from a backup prior to block 12572500, or from genesis.

    We apologize for the inconvenience and will share a full post-mortem when ready.

  • Investigating
    Investigating

    Our team is investigating reports of issues with full node sync. At this time, users syncing full nodes may experience degraded performance.

    We apologize for the inconvenience and will share an update once we have more information.

Mainnet Safe Head Stall
  • Resolved
    Resolved

    Our team has resolved the safe head stall. Safe-only sync should now be fully operational for all users. If you continue to experience an issue, please let us know on Discord.

    Thanks for your patience with us!

  • Identified
    Identified

    Our team has identified the cause of the safe head stall, and is actively working on a fix.

    The issue is the result of an improperly closed channel. This is a known issue with the batcher, and will most likely resolve itself within the next hour.

    At this time, users syncing the safe head only will continue to experience delays receiving new blocks until a new batch is posted.

    Please wait while the improperly closed channel automatically expires.

    We’ll continue to share updates as we have them.

  • Investigating
    Update

    Our team continues to investigate the safe head stall. At this time, users who only sync the safe head will continue to experience delays receiving new blocks. Users syncing the unsafe head will continue receiving new blocks. Transactions are being processed on the sequencer as normal.

    We narrowed down the issue to a problem submitting a batch to L1. These issues typically resolve themselves within an hour.

    We’ll continue to update you here.

  • Investigating
    Investigating

    Our team is investigating reports of a safe head stall on mainnet. At this time, users who only sync the safe head may experience delays receiving new blocks until a new batch is posted.

    We apologize for the inconvenience and will share an update once we have more information.